Caner Erden

Caner Erden

Endüstri Mühendisi, Araştırma Görevlisi

Yayınlar

Makaleler

  1. Erden, C., Demir, H. İ., Göksu, A., & Uygun, Ö. (2018). Solving Process Planning, ATC Scheduling and Due-date Assignment Problems Concurrently Using Genetic Algorithm for Weighted Customers. Academic Platform-Journal of Engineering and Science, 6(1), 87–96. https://doi.org/10.21541/apjes.318451
  2. Teke, Ç., Okutkan, C., & Erden, C. (2017). Determining the Production Amounts in Textile Industry with Fuzzy Linear Programming. International Journal of Engineering and Technology Research, 2(1), 1–6. Retrieved from http://dergipark.gov.tr/ijente/issue/32734/363156
  3. Arslan, F. N., Teke, Ç., & Erden, C. (2017). Project Management Application in Food Machine Manufacturing Company. International Journal of Engineering and Technology Research, 2(1), 7–12. Retrieved from http://dergipark.gov.tr/ijente/issue/32734/363158
  4. Demir, H. I., Erden, C., Demiriz, A., Dügenci, M., & Uygun, O. (2017). Integrating Process Planning, WATC Weighted Scheduling, and WPPW Weighted Due-Date Assignment Using Pure and Hybrid Metaheuristics for Weighted Jobs. International Journal of Computational and Experimental Science and Engineering, 3(1), 11–20. Retrieved from http://iakkurt.dergipark.gov.tr/ijcesen/issue/30007/323860
  5. Demir, H. I., Goksu, A., Canpolat, O., Erden, C., & Nur, M. (2017). Solving Process Planning and Scheduling with Number of Operation Plus Processing Time Due-Date Assignment Concurrently Using a Genetic Search. International Journal of Mechanical, Aerospace, Industrial, Mechatronic and Manufacturing Engineering, 11(7), 1297–1303. Retrieved from https://waset.org/Publication/solving-process-planning-and-scheduling-with-number-of-operation-plus-processing-time-due-date-assignment-concurrently-using-a-genetic-search/10007405
  6. Erden, C., Tanyeri, A. E., İşgören, H., & Şimşek, N. (2016). Investigation of The Effect on the Buying Behavior of Female Figure Usi̇ng Factor Analysis Method: Male Grooming Products Case. Akademic Perspective, (58), 80–95. Retrieved from http://www.akademikbakis.org/?sayfa=dergiayrinti&no=1723&icerik=kadin-figurunun-satin-alma-davranisina-etkisinin-faktor-analizi-yontemiyle-incelenmesi-erkek-bakim-urunleri-ornegi&kategori=isletme
  7. Demir, H. I., Erden, C., Ipek, M., & Uygun, O. (2017). Solving Weighted Number of Operation Plus Processing Time Due-Date Assignment, Weighted Scheduling and Process Planning Integration Problem Using Genetic and Simulated Annealing Search Methods. International Journal of Mechanical, Aerospace, Industrial, Mechatronic and Manufacturing Engineering, 11(1), 73–81. Retrieved from http://scholar.waset.org/1999.8/10006048%0Ahttp://www.waset.org/publications/10006048
  8. Demir, H. I., Cakar, T., Ibrahim Cil, Dugenci, M., & Erden, C. (2016). Integrating Process Planning, WMS Dispatching, and WPPW Weighted Due Date Assignment Using a Genetic Algorithm. International Journal of Computer and Information Engineering, 10(7), 1290–1298. Retrieved from http://scholar.waset.org/1307-6892/10005156
  9. Tanyeri, A. E., Erden, C., & Çerezci, F. (2017). Students Profile Choosing Sakarya University in the 2016‐2017 Fall Semester and Their Reasons to Choose. The Online Journal of Quality in Higher Education, 4(2), 37–41. Retrieved from http://www.tojqih.net/journals/tojqih/articles/v04i02/v04i02-07.pdf
  10. Erden, C., Uçar, A., & Erbay, E. (2016). Application of Basic Principles of Ergonomics in a Textile Workshop. International Journal of Engineering and Technology Research, 1(1), 23–37. Retrieved from http://dergipark.gov.tr/ijente/issue/27217/363149
  11. Demir, H. I., & Erden, C. (2017). Solving process planning and weighted scheduling with WNOPPT weighted due-date assignment problem using some pure and hybrid meta-heuristics. Sakarya University Journal of Science, 21(2), 1–1. https://doi.org/10.16984/saufenbilder.297014
  12. Erden, C., Kökçam, A. H., & Demir, H. I. (2016). A Two-Phase Modeling with Genetic Algorithm for Solving Exam-Invigilator Timetabling Problem. International Journal of Engineering and Technology Research, 1(1), 13–22. Retrieved from http://dergipark.gov.tr/ijente/issue/27217/363145
  13. Ceviz, E., & Erden, C. (2015). Growth rate factor analysis of Turkey using Grey system theory. Sakarya University Journal of Science, 19(3), 361–369. https://doi.org/10.16984/saufenbilder.75926
  14. Erden, C., Yener, F., Çil, I., & Çerezci, F. (2016). Fuzzy Axiomatic Design for Solving the Facility Layout Problem of a Furniture Company. International Journal of Operations and Logistics Management, 5(3), 145–155. Retrieved from http://absronline.org/journals/index.php/ijolm/article/view/644
  15. Erden, C., & Çelebi, N. (2016). Accident Causation Factor Analysis of Traffic Accidents using Rough Relational Analysis. International Journal of Rough Sets and Data Analysis, 3(3), 60–71. https://doi.org/10.4018/IJRSDA.2016070105
  16. Erden, C., & Nazarov, M. (2016). Rough Sets Approach in Analysis of Yarn Friction Properties. Erzincan University Journal of Science and Technology, 9(1), 75–86. https://doi.org/10.18185/eufbed.99908

Tam Metin Basılan Bildiriler

  1. Karayel, H., Demir, H. İ., Erden, C., & Kökçam, A. H. (2018). Çok kriterli karar verme teknikleri ile en uygun LNG doğal gaz tedarikçisi seçimi: Güncel şartlara göre Türkiye Örneği. In International Congress of Energy, Economy and Security (p. 19). İstanbul, Kozyatağı Hilton Hotel, 21-22 Nisan 2018.
  2. Nebioğlu, M., Tanyeri, A. E., Erden, C., & Çerezci, F. (2016). Sakarya Uni̇versi̇tesi̇ Fen Bi̇li̇mleri̇ Ensti̇tüsünü 2016-2017 Güz Yarı Yılında Terci̇h Eden Oğrenci̇leri̇n Profi̇li̇ ve Terci̇h Nedenleri̇. In International Conference on Quality in Higher Education (pp. 695–700). Sakarya, Turkey. Retrieved from http://www.icqh.net/publication_folder/icqh/icqh2016.pdf
  3. Demir, H. I., Kökçam, A. H., Ipek, M., & Erden, C. (2017). Solving Process Planning, Weighted Apparent Tardiness Cost Dispatching, and Weighted Processing Plus Weight Due-Date Assignment Simultaneously Using a Hybrid Search. In 2nd International Conference on Advanced Engineering Technologies (ICADET’17) (pp. 337–351). Bayburt, Turkey. Retrieved from http://icadet.bayburt.edu.tr
  4. Çerezci, F., Çerezci, O., & Erden, C. (2017). Investigation of Electromagnetic Pollution Awareness Trends with Apriori Algorithm. In 2nd International Conference on Advanced Engineering Technologies (ICADET’17) (pp. 541–545). Bayburt, Turkey.
  5. Demir, H. I., Erden, C., Goksu, A., & Uygun, O. (2016). Solving Process Planning, ATC Scheduling and Due-date Assignment Problems Concurrently Using Genetic Algorithm for Weighted Customers. In 4th International Symposium on Innovative Technologies in Engineering and Science (ISITES2016) 3-5 Nov 2016 Alanya/Antalya – Turkey (pp. 1759–1770). Antalya, Turkey.
  6. Saygılı, M., Özdemir, A., Tanyeri, A. E., & Erden, C. (2016). A Research on The Analysis of Attitudes Towards Environmental Consciousness and Eco-friendly Products Awareness: The Case of Adiyaman University. In 3rd International Symposium on Environment and Morality (ISEM2016) 4-6 Nov 2016 Alanya/Antalya – Turkey (pp. 1089–1098). Antalya, Turkey. Retrieved from http://i-sem.info/PastConferences/ISEM2016/ISEM2016/Allpapers/13-ISEM2016ID346.htm
  7. Erden, C., & Tüysüz, F. (2014). An Application of Rough Sets Theory on Traffic Accidents. In International Conference on Engineering and Applied Sciences Optimization (pp. 2195–2208). Kos Island, Greece.

Özet Basılan Bildiriler

  1. Demir, H. I., Erden, C., Kökçam, A. H., & Onur Canpolat. (2018). Solving Process Planning, WMS Dispatching, and WPPW Weighted Due-Date Assignment Simultaneously Using Random-Genetic-Hybrid Search. In International Conference on Innovations in Natural Science and Engineering (p. 36). Famagusta, Turkish Republic of Northern Cyprus. Retrieved from http://www.icinse.com/
  2. Demir, H. I., Demiriz, A., Dugenci, M., Uygun, O., & Erden, C. (2016). Integrating Process Planning, WATC Weighted Scheduling, and WPPW Weighted Due-Date Assignment Using Genetic Algorithm for Weighted Jobs. In 3rd International Conference on Computational and Experimental Science and Engineering (ICCESEN 2016). Antalya, Turkey.
  3. Demir, H. I., Cakar, T., Ibrahim Cil, Dugenci, M., & Erden, C. (2016). Integrating Process Planning, WMS Dispatching, and WPPW Weighted Due Date Assignment Using a Genetic Algorithm. In 18th International Conference on Engineering and Technology Management (p. 10). Istanbul, Turkey. Retrieved from dai.waset.org/1307-6892/51544
  4. Demir, H. I., Erden, C., Ipek, M., & Uygun, O. (2017). Solving Weighted Number of Operation Plus Processing Time Due-Date Assignment, Weighted Scheduling and Process Planning Integration Problem Using Genetic and Simulated Annealing Search Methods. In 19th International Conference on Industrial Engineering and Management (p. 12). Dubai, United Arab Emirates. Retrieved from dai.waset.org/1307-6892/57629
  5. Demir, H. I., Goksu, A., Onur Canpolat, Erden, C., & Nur, M. (2017). Solving Process Planning and Scheduling with Number of Operation Plus Processing Time Due-Date Assignment Concurrently Using a Genetic Search. In 19th International Conference on Advanced Industrial Engineering and Manufacturing Processes (p. 13). Istanbul, Turkey. Retrieved from http://waset.org/pdf/books/?id=68612&pageNumber=13
  6. Demir, H. I., Erkayman, B., Erden, C., & Ipek, M. (2017). Integrated Process Planning , WATC Dispatching , and WPPW Weighted Due-Date Assignment Using a Hybrid-SA Search. In 2nd International Conference on Advanced Engineering Technologies (ICADET’17) (p. 1651). Bayburt, Turkey.
  7. Tanyeri, A. E., Erden, C., & İşgören, H. (2017). Sakarya Universitesi Fen Bilimleri Enstitüsünü 2017-2018 Güz Yarı Yılında Tercih Eden Yabancı Uyruklu Oğrencilerin Profili ve Tercih Nedenleri. In International Conference on Quality in Higher Education(ICQH) (p. 222). Sakarya, Turkey.
  8. Çerezci, F., Çerezci, O., & Erden, C. (2017). An Investigation of Awareness About Electromagnetic Pollution for Employees Using Data Mining Techniques. In International Conference on Mathematics and Engineering (p. 340). Istanbul, Turkey.